common reasons for solar permit rejections

Securing permits is one of the most critical and time-sensitive steps in any solar installation project. Yet, for many solar contractors and installers, permit rejections remain a frustrating obstacle that delays timelines, increases costs, and erodes customer satisfaction.

Understanding the most common reasons behind permit denials—and learning how to proactively avoid them—can significantly improve your approval rates, reduce rework, and streamline project execution.

This blog outlines the top reasons why solar permits get rejected and offers practical steps to prevent them.


1. Incomplete or Inaccurate Documentation

One of the leading causes of solar permit rejections is submitting incomplete or inaccurate documentation. Building departments and Authorities Having Jurisdiction (AHJs) require a comprehensive set of documents that clearly outline the scope and specifications of the project.

Common mistakes include:

  • Missing structural or electrical diagrams
  • Inconsistent system specifications between plan sets
  • Inaccurate site plan details or property lines
  • Omitted product cut sheets or specification sheets

How to avoid it:

  • Use a standardized checklist for every permit submission
  • Double-check all plan sets for consistency
  • Ensure all manufacturer datasheets are included and up to date
  • Partner with experienced permit design professionals who understand local codes and formatting expectations

2. Non-Compliance With Local Codes or Regulations

Every AHJ follows a set of local building, electrical, and fire codes that vary widely from one jurisdiction to another. A solar design that complies in one area may be rejected in another simply because it doesn’t meet specific local requirements.

Examples include:

  • Roof setbacks not meeting local fire codes
  • Conduit routing that violates fire department access
  • Panel placement infringing on vent clearance zones
  • Improper wire sizing or grounding based on local amendments

How to avoid it:

  • Research AHJ-specific code amendments before submitting designs
  • Stay up to date with National Electrical Code (NEC) updates and how they’re adopted locally
  • Incorporate fire and building department preferences into your plan set templates
  • Use design partners who have a proven track record in your jurisdiction

3. Structural Concerns or Insufficient Engineering Details

AHJs are responsible for ensuring that solar systems do not compromise the structural integrity of the building. If your structural calculations are insufficient, unclear, or missing altogether, the permit will almost certainly be rejected.

Common structural issues:

  • No loading calculations or mounting hardware specs
  • Outdated or generalized racking details
  • Roof diagrams that don’t show truss locations or roof framing
  • Missing PE (Professional Engineer) stamp when required

How to avoid it:

  • Include detailed structural calculations based on actual roof load data
  • Provide manufacturer-specific mounting hardware specs
  • Show rafter layout, roof pitch, and connection details clearly
  • Obtain an engineering stamp when required by code or AHJ policy

4. Electrical Plan Errors

Even minor errors in electrical diagrams can result in a permit denial. Since the electrical portion of the solar system directly ties into the home or building’s existing grid, jurisdictions are highly attentive to these details.

Common errors:

  • Incorrect wire sizing for voltage drop
  • Mismatch between inverter spec and load calculation
  • Absence of rapid shutdown device details
  • Improper labeling or breaker configuration

How to avoid it:

  • Perform detailed load and voltage drop calculations
  • Cross-check inverter and panel configurations with actual product specs
  • Use pre-verified templates for rapid shutdown and disconnect switch placement
  • Label each component clearly in the one-line diagram

5. Missing Site-Specific Details

AHJs want to ensure that each solar system is designed for its specific environment and structure—not just copied from a standard template. Submitting a generic or “cookie-cutter” design often leads to rejection.

Issues often flagged:

  • Lack of a site-specific shading analysis
  • Incomplete or outdated aerial imagery
  • Incorrect roof orientation or tilt angle
  • Not accounting for obstructions like chimneys or vents

How to avoid it:

  • Use satellite imagery and on-site survey data to generate accurate site plans
  • Include solar access/shading reports in every permit package
  • Double-check measurements, tilt, and azimuth using software tools
  • Clearly indicate obstacles and ensure panels are positioned accordingly

6. Zoning or HOA Restrictions

In some areas, zoning ordinances or Homeowners’ Association (HOA) guidelines may affect the installation of solar panels. Even if your design is technically compliant with building codes, it could still be rejected if it conflicts with zoning laws or HOA rules.

Typical conflicts:

  • Ground-mount systems in setback-restricted areas
  • Rooftop visibility violations in historical districts
  • HOA restrictions on front-facing panels
  • Height limits for solar structures

How to avoid it:

  • Research and comply with all local zoning requirements before submitting
  • Communicate with HOAs and obtain approvals when required
  • Consider alternative configurations (backyard, carport, etc.) if the primary layout isn’t permissible
  • Provide visual mockups to demonstrate minimal aesthetic impact

7. Outdated Permit Forms or Fees

Sometimes, permit rejections are purely administrative. Submitting an outdated permit application, using the wrong version of a checklist, or paying the incorrect fee can delay approval.

Avoidable missteps:

  • Submitting plans to the wrong department or portal
  • Forgetting to sign required declaration forms
  • Providing old application templates
  • Payment errors or missing receipts

How to avoid it:

  • Visit the AHJ’s website before every new submission to verify requirements
  • Use up-to-date permit packets and double-check fee schedules
  • Train your team on AHJ submission protocols
  • Track permit submittals using a project management platform

8. Interconnection or Utility Issues

While not technically a city permit rejection, interconnection application denials by the utility can stall or completely derail a project.

Common issues:

  • Incomplete or mismatched system specs
  • Overload concerns on a specific transformer
  • Unclear metering configuration
  • Missing single-line diagram in utility format

How to avoid it:

  • Coordinate utility and permit submissions together
  • Follow utility-specific formatting guidelines
  • Be aware of grid saturation zones where export limits may apply
  • Communicate proactively with the utility provider for feedback

Final Thoughts

Solar permit rejections not only delay installations but also damage your reputation and customer trust. In a competitive solar market, speed and accuracy in permitting can be a major differentiator. The good news is that most permit issues are preventable with the right process, training, and partners.

To minimize permit rejections:

  • Develop thorough QA/QC processes
  • Stay current with evolving AHJ and utility requirements
  • Invest in design teams that understand local codes inside and out
  • Treat the permitting process as a technical and administrative discipline—not just paperwork

A clean permit submission not only accelerates approvals but also signals professionalism, accountability, and technical excellence to customers and regulators alike.